We built in-situ beams, fixed steel mats, and installed perimeter shutters...
This project had lots of beams running directly through the slab. These beams had to be built in situ first, due to the steel design, and then fixed the bottom matt followed by the top matt. Shutters were then installed around the perimeter of the slab, ready for concrete to be poured.