Carefully navigating live services, we meticulously excavated, installed steel..
This project was a challenging job for our team as there were various live services passing through the reinforcement. The ground had to be slowly and carefully excavated using a vac ex, and by hand. The steel was then installed in situ carefully around the services, cordek fitted, backfilled, and concrete poured. All this had to be done in stages to ensure the safety of both the live services and our team.